Customer needs
Create an IT room with 1 MW capacity and TIER III certification, ensuring maximum efficiency and safety.
Solution implemented
- Design and construction of a 700 m² IT room.
- Installation of LV electrical systems, air conditioning and wiring.
- Racks (142) and TIER III certification.
Objectives and benefits obtained
- Increased network density and operational capacity.
- High reliability for critical applications.
- Energy efficiency thanks to the Bucket N+2 system.
